top of page
Davit Base.jpg

loler testing

LOLER applies to any lifting devices whether lifting personnel or materials and regardless of whether they are permanent or temporary systems. It ensures that lifting equipment and related accessories are safe for use & compliant with regulatory standards.

understanding loler testing

The Lifting Operations & Lifting Equipment Regulations 1998 (LOLER) was developed by the HSE and was made law under the Health & Safety at Work Act 1974.

equipment covered

Abseil Posts & Eyebolts

Davit Bases & Davit Arms

Abseil Rails / Tracks

Winches

Powered Access Equipment

Cranes & Hoists

type & frequency of testing

Initial LOLER test & certification - To be completed upon installation & before first use of the system which includes a physical load test under real working conditions. This test should be completed before any of the building fabric is completed around the equipment.

6 monthly visual & thorough inspection - At regular intervals, a thorough examination is required and includes a comprehensive assessment of the equipment's structural integrity, mechanical components, safety features & any wear & tear

contact us to book your inspection

Our team will assess all your requirements and provide a complimentary, no-obligation quote for surveying and inspecting your roof safety equipment.

bottom of page